top of page
Search

Summerall Gate Road gets a Facelift

The City of Anniston has recently completed the resurfacing of Summerall Gate Road on McClellan. This $572,000 project included the milling and resurfacing of two miles of road. As one of the two main entrances to McClellan off of Highway 21, this highly traveled road had deteriorated over the years and was in need of a serious facelift. Today, vehicles on McClellan can enjoy a smooth ride all the past the Aquatic Center to the traffic circle or continue on to the McClellan Medical Mall on Town Center Drive.

bottom of page